MassDOT recently released the long-awaited Environmental Assessment for the Longfellow Bridge reconstruction project, which reveals the design MassDOT has chosen for the bridge. To its credit, MassDOT clearly listened to much of the input from the Longfellow Bridge Task Force (on which I served): As seen above, the outbound (Boston-to-Cambridge) side of the bridge as [...]



